Kitchen Renovation in Stockholm: How It Works & Cost

A kitchen renovation can be anything from new doors for 25,000 SEK to a complete new kitchen with a changed layout for over 300,000. What determines the price is rarely the material choice, but whether the sink, hob and appliances move. The labour cost earns a 30 percent ROT deduction if you own the home.

What it costs

2026 estimates, including materials:

ScopeApproximate cost
New doors, worktop and handles25,000–60,000 SEK
New kitchen, existing layout120,000–250,000 SEK
New kitchen, changed layout200,000–400,000 SEK+

For a full new kitchen, roughly 40 percent goes to labour and 60 percent to materials, because carcasses, doors, worktops and appliances weigh heavily. That matters for the ROT deduction, which applies only to the labour portion.

Is replacing just the doors enough?

Often, and it is the most overlooked saving in the whole project.

If the carcasses are sound and the layout works, new doors, a new worktop and new handles give an almost-new impression for a fraction of the cost. Add a new tap and under-cabinet lighting and the difference is greater still.

Replace the whole kitchen when:

  • The carcasses are water-damaged or breaking down
  • The layout does not work
  • You want to move appliances or the sink
  • The dimensions are non-standard and doors are no longer available

What a kitchen renovation includes

  • Demolition and removal of the old fittings
  • Electrical: new sockets, lighting, connecting appliances
  • Plumbing: sink, tap, connecting the dishwasher
  • Any relocation of water and drainage
  • Carpentry: fitting carcasses, doors, worktop and trim
  • Tiling or splashback behind the counter
  • Painting and flooring, often as extras

Timeline

WeekStage
1Demolition, waste removal, first fix electrical and plumbing
1–2Wall work, filling, new flooring if included
2–3Fitting carcasses, doors and worktop
3Connecting appliances, sink and lighting
3–4Splashback, trim, painting, adjustments

A standard kitchen takes two to four weeks, a door replacement a few days. Expect to be without a kitchen for most of that time. Setting up a temporary kitchenette elsewhere with a microwave, kettle and fridge makes a real difference.

Order the kitchen well in advance. Lead times on carcasses and worktops, especially made-to-measure stone, are often several weeks and dictate when work can start.

Electrical and plumbing need a certified firm

A carpenter can fit the kitchen but may not connect electricity or water.

Ask who the main contractor is and who coordinates the different trades. This is the most common reason kitchen projects overrun: the electrician cannot come until the carpenter has finished, and the carpenter cannot continue until the wiring is in.

If the sink or dishwasher moves, new water and drainage runs are needed, and in an apartment that can be limited by where the risers sit.

ROT for a kitchen renovation

ROT is 30 percent of the labour cost in 2026, up to 50,000 SEK per person per year (Skatteverket).

Worked example for a new kitchen:

LineAmount
Labour: demolition, carpentry, electrical, plumbing70,000 SEK
ROT deduction, 30% of labour−21,000 SEK
Materials: carcasses, doors, worktop, appliances105,000 SEK
Total to pay154,000 SEK

Note that materials are the majority of a kitchen bill, and none of it earns a deduction. Insist the quote itemises labour and materials from the start.

If two of you own the home, split the invoice and use both ceilings. See the ROT deduction.

If you own a bostadsrätt

Check the association's rules and ask the board before starting, particularly if you plan to:

  • Move water or drainage
  • Touch load-bearing walls
  • Change ventilation or how the extractor connects

Connecting an extractor fan to the building's ventilation is specifically regulated in many associations, because a motorised fan can upset the balance of the whole system.

Common questions

What does a kitchen renovation cost?

Doors and worktop 25,000 to 60,000 SEK, a new kitchen in the existing layout 120,000 to 250,000, and with a changed layout 200,000 to 400,000 SEK or more (2026 estimates).

What drives the price most?

Whether the layout changes. Moving the sink, hob or appliances requires new electrical and plumbing.

Is replacing just the doors enough?

Often yes, if the carcasses are sound and the layout works.

How long does a kitchen renovation take?

Two to four weeks for a standard kitchen, a few days for doors.

Do I need a certified electrician and plumber?

Yes. Electrical requires a company registered with Elsäkerhetsverket, and plumbing must follow the industry rules.

Does a kitchen renovation qualify for ROT?

Yes, 30 percent of the labour if you own the home. Materials earn nothing.


Related guides: bathroom renovation cost, the ROT deduction and electrician cost and ROT. Back to renovation in Stockholm.